Problem: This patient had caries on #6 under an existing bridge with
periapical pathosis.
Solution: The following major dental procedures were performed: root canal, and fabrication of a 6-unit replacement bridge.
Figure 1. Before treatment. |
![]() |
Figure 2. After bridge removal and root canal treatment. |
![]() |
Figure 3. Temporary bridge fabricated for teeth #6-#9. |
![]() |
Figure 4. Temporary bridge in place. |
![]() |
Figure 5. Preparation for cast post and core placement: drill. |
![]() |
Figure 6. Preparation for cast post and core placement: plastic. |
![]() |
Figure 7. Preparation for cast post and core placement: checking depth and position. |
![]() |
Figure 8. Build-up with GC resin pattern for core. |
![]() |
Figure 9. Build-up: palatal view. |
![]() |
Figure 10. Post and core in GC pattern resin. |
![]() |
Figure 11. Gold post and core returned from lab. |
![]() |
Figure 12. Cast post and core cemented in place. |
![]() |
Figure 13. Gingival retraction using double cord technique. |
![]() |
Figure 14. Impression made with Aquasil. |
![]() |
Figure 15. Six-unit temporary bridge placed. |
![]() |